Pre-generation clarity
The user can see how strongly the current post matches the selected project before spending time on analysis or drafting.
ReplyRadar now shows the selected project's opportunity score before the user clicks Generate Reply or Generate Comment, which makes it easier to understand fit before opening the draft workflow.
The user can see how strongly the current post matches the selected project before spending time on analysis or drafting.
When multiple projects are available, the visible score updates with the active project selection instead of staying locked to the first guess.
A high visible score makes the next click easier to justify, while a lower score signals that the post may not be worth the effort.
Preview scores work especially well with score thresholds because the user can see the rule and the result in the same row.
The decision to click Generate is small, but repeated many times in a day. Exposing the score early reduces uncertainty and helps the user reserve energy for the posts that actually fit the product context.
The operator can make a faster keep-or-skip decision in the feed.
Project switching becomes easier because the score follows the selection.
The workflow feels less like blind prompting and more like reviewed prioritization.
The user can compare opportunities without opening each reply panel first.
When the visible score aligns with the analyzed score after click, the product feels more coherent. That consistency matters because it teaches the operator which kinds of posts are genuinely high-fit over time.
Score previews make the eventual analyzed score feel less surprising.
Teams get a clearer bridge from discovery to draft generation.
Threshold-based filtering becomes easier to understand and tune.
The scoring model turns into a repeatable habit instead of a hidden backend step.